Construction Detail: Foundation Footings

Pete Sucheski

Jump Footing

1. Short Span The maximum allowable wall span between footings is 4 feet (for longer spans, consult an engineer).

2. Easy Jump The maximum difference in elevation for residential walls with discontinuous footings is 5 feet.

3. Reinforcing To enable the wall section to function as a beam, install two #4 steel reinforcing rods at the top and bottom (extending 3 feet into the main wall).

Where foundation footings change elevation, forming and pouring a continuous footing is problematic. But the ACI 332 standard referenced in recent codes allows short wall sections to span between discontinuous footings, within certain limits.


About the Author

Ted Cushman

Contributing editor Ted Cushman reports on the construction industry from Hartland, Vt.

Upcoming Events

  • What’s Ahead in Housing: Find Your Next Revenue Move

    Webinar

    Register Now
  • Building Future-ready Communities for Less

    Webinar

    Register Now
  • Future Place

    The Ritz-Carlton, Dallas Las Colinas Irving, TX

    Register Now
All Events